Individual Term Project Part 1

In the Individual Term Project assignment, u will choose one of two described projects (or one of their own) and generate a complete project plan

Part 1: Selection of Project and Scope Statement as outlined in the Individual Term Project document

You can choose one of the following 2 options: ( I prefer first one, but u can select either one u feel comfortable)
    Consider the construction of a $500,000 single family house in your city or region. Develop the project plan that would see this completed.
    Develop a project plan for the rebranding of a university.  Start with the Board of Governors decision to develop a new name and brand and have it ready for a fall recruitment drive.

    The option selected may be submitted in a Scope Statement format. You may use your own format, as long as the key information is included.
    Brevity is important along with concise writing.
    If you are not sure of some details, which will be developed later, include logical estimates. For instance, the cost may be difficult to determine, but indicate the general magnitude.
    Identify the project management software you intend to use to ensure its compatibility with this project. ( Microsoft Excel has numerous spreadsheet templates catering to project management application )  State in the report that you will choose Microsoft Excel

1-2 pages and in APA format.

Grade Standard

1.     The Project Charter contains the six elements as indicated in the example    /40
2.    The charter is concise and contains specific deliverables and responsibilities    /30
    The charter confirms the authorization to proceed     /20
3.    Attention to Detail (10%)   
    Accompanying text has correct APA referencing and formatting (title, headings, and references)    /5
    Spelling and grammar    /5
    Total    /100